High-End Commercial Office – THFC Regeneration Scheme

High-End Commercial Office – THFC Regeneration Scheme

When Code Security Systems was offered the chance to complete various works at Tottenham Hotspurs new head offices situated at the heart of the High Road in Tottenham, we was very happy to get involved in a rather special building that was a big part of the local community……

 

08-09-2015

Project Details back to case studies

DateDecember 2014

locationLondon N17

Whilst working closely with consultants in the design the various systems within the large floor space in the new office layout we had a number of factors to consider. Within the building we had to make sure that our installation of all induction loop systems for the hard of hearing had been set up to perfection so as not to allow important meeting information to bleed to possible areas that it should not have. This could result in the wrong ears hearing the information.

In addition we came across a scenario which seems to be becoming a trend within modern buildings now, all of the ceilings space which used to hide services is completely on show!! With a large Fire Detection System and disabled persons toilet facilities to install it was at the very least a challenge. The deadlines were tight and the room for error was less than minimal, but we got there on time and the end result was nothing less than exactly what we expect, excellent!!

  • Facebook Twitter Google Plus Linked In